Custom ADU Construction Built to Expand Your Property

Seattle ADU projects designed for zoning compliance, tight urban lots, and long-term rental or family use.

Professional ADU Construction for Residential Properties

A thoughtfully planned ADU can serve many purposes—from rental income and guest housing to multi-generational living or private workspace.

Top Quality Construction Group provides full-service ADU construction, managing everything from early feasibility and design coordination to permitting, construction, and final inspection. Our approach focuses on clear planning, structural integrity, and long-term performance—so your ADU works well today and continues to add value over time.

Our work is grounded in clear planning, local code compliance, and construction methods designed for long-term performance.

Our ADU construction services include:

  • Detached backyard ADUs
  • Garage conversions and rebuilds
  • Attached ADUs and home additions
  • Structural framing, foundations, and utilities coordination
  • Code-compliant construction and inspections
  • Finish work designed for durability and livability

A Trusted Partner for ADU Planning & Construction

Building an ADU is a significant investment that requires careful planning and experienced execution.

Our team takes a structured, transparent approach—setting expectations early and delivering work that meets local building standards.

Rather than rushing complex builds or oversimplifying decisions, we focus on creating ADUs that function well, meet code, and continue adding value long after construction is complete. Our role is to help you make informed choices and deliver a finished space that feels intentional, durable, and well executed.

Our ADU Planning & Construction Approach

Accessory Dwelling Units require careful coordination between property constraints, local regulations, and long-term use considerations.

Our process is designed to clarify options early, reduce surprises, and guide projects from concept through completion with structure and transparency.

Phase 1: Property Feasibility & Use Evaluation

We begin by reviewing your property layout, access points, existing structures, and intended use for the ADU. This step helps determine what configurations are viable and identifies potential limitations before design decisions are made.

Phase 2: Concept Development & Scope Definition

Based on feasibility findings, we help shape the overall concept—refining size, layout, and general design direction. Project scope, priorities, and expectations are aligned so decisions remain consistent throughout the build.

Phase 3: Permitting Coordination & Pre-Construction Planning

Plans and documentation are prepared and coordinated to support required permits and approvals. This stage ensures the project is positioned to move forward smoothly before construction begins.

Phase 4: Structural Build-Out & Installation

Construction moves forward with an emphasis on structural integrity, code compliance, and build quality. Framing, utilities coordination, and interior build-out are completed in accordance with approved plans and specifications.

Phase 5: Completion & Review

Once construction is complete, we review the finished ADU with you to confirm that the work aligns with the original plan and expectations. Final details are addressed so the space is ready for use with confidence.

Considering an ADU for Your Property?

ADU projects involve zoning rules, layout tradeoffs, and long-term planning decisions. A brief consultation can help clarify feasibility and next steps.

ADU Construction FAQs

Below are answers to some of the most common questions homeowners ask when researching ADU construction.

Yes. Even though accessory dwelling units are allowed on most residential lots, every ADU still has to go through the Seattle permitting process. Zoning rules control height, setbacks, lot coverage, and how many units are allowed, and construction plans must be reviewed for structural, plumbing, electrical, and energy-code compliance before work can begin.

In Seattle, permit review typically takes two to five months, depending on zoning, site conditions, and whether corrections are required. Projects involving utility upgrades, drainage review, or environmental overlays can take longer, which is why ADU timelines are usually driven more by permitting than by construction

In many Seattle neighborhoods, yes. The city allows up to two ADUs on a single lot when size, height, and lot-coverage requirements are met. Whether both are allowed depends on the existing home, the lot layout, and how the units are designed.

Costs vary widely based on size, foundation type, utility connections, access, and finish level. Detached ADUs usually cost more than basement or attached units because they require new foundations, framing, and separate utility runs. In urban areas, site access and utility upgrades often have a bigger impact on cost than square footage alone.

Older homes may need electrical panel upgrades, larger water lines, or new sewer connections to safely support an additional dwelling. These requirements are typically identified during the design and permit phase and can significantly affect the overall budget.

Yes. Seattle allows ADUs to be used as long-term rental units. Short-term rentals, such as vacation rentals, have additional registration and compliance requirements and are regulated separately.

Yes. In Seattle, the county reassesses the added living space when an ADU is built, which increases the home’s taxable value. The increase is based on the value of the new unit, not simply the construction cost, and many homeowners offset it with rental income or higher resale value.

This can happen, especially on older or infill lots. If issues are found during excavation or inspection, the city may require engineering revisions or design changes. A properly planned ADU project accounts for these possibilities so they don’t become major delays or budget shocks.

Most ADUs in Seattle require architectural drawings, structural engineering, and energy-code documentation before permits can be issued. A full-service ADU builder coordinates these disciplines so the plans, permits, and construction stay aligned.

Detached ADUs have minimal impact on your living space, while basement or attached units require more access, noise, and utility work. On tighter lots, careful staging and scheduling are especially important to keep disruption manageable.

An ADU includes workmanship warranties on the construction itself, as well as manufacturer warranties on materials such as roofing, windows, siding, and appliances. Structural and installation quality are covered separately from product warranties.

Many homeowners use home-equity loans, cash-out refinancing, construction loans, or private financing. Because ADUs can generate rental income, some lenders treat them as income-producing improvements.

Most ADU builds take six to ten months after permits are issued, depending on size, site access, utility complexity, and inspection scheduling.

In most cases, yes. An ADU adds livable square footage and rental potential, which typically increases both market value and buyer demand. Homes with permitted ADUs often sell for more because they offer income, multigenerational living options, or flexible use of space.

The Practical Value of a Well-Planned ADU

An ADU changes how a property functions, not just how it looks. When designed and built with long-term use in mind, it can provide independent living space that feels intentional, comfortable, and well integrated with the main home.

A professional approach helps ensure the ADU meets structural requirements, complies with local regulations, and holds up to daily use without constant maintenance concerns.

Advantages of a professionally built ADU include:

  • Flexible living space for guests, family members, or private use
  • Improved property functionality without the need to relocate
  • Construction aligned with current building and safety standards
  • Layouts designed for everyday comfort and efficiency
  • Long-term durability that supports extended use or rental scenarios

A thoughtfully executed ADU supports changing lifestyle needs while strengthening the overall utility and value of the property.

Discuss Your ADU Options with a Professional Team

Building an ADU is a significant investment that requires the right planning upfront. We work with Seattle homeowners to evaluate property constraints, clarify design possibilities, and align the project scope with long-term goals before moving forward.

 

Prefer to speak directly? Call (206) 712-0500.

We typically respond within one business day.